8 7212 41 53 86
8 778 266 08 81
Reconstruction of electric distribution networks of entire Tengiz oil-field Promysla is being implemented in the frameworks of this project which increases reliability and optimizes utilization of existing35 and 6 kV overhead lines. Throughout the period of this project the following work was implemented: