• Construction of new exhaust overhead line (OHL) 10 kV of total length – 2,5 km;
• Installation of unitized transformer substation 10/0,4 kV (UTS) and transformer with voltage 160kVA;
• Grounding of UTS;
• Commissioning works for OHL-10kV and UTS 10/0,4 kV.