Сompletion of the project TG-6.3 53.6 MVA Generator Replacement, 78,718 man/hours

Within the frameworks of this project, the following work was performed but not limited to:

-          dismantling and deinstallation of the existing generator and TG-6.3 reducing gear (Frame 6), and associated dismantling works in Instrumentation and Control, Mechanics, Electrics and general construction works;

-          filling and laying new foundations for pipelines, bus bars and maintenance areas, and other construction works;

-          installation of a new generator and TG-6.3 reducing gear for new and updated sites;

-          mechanical and commissioning works in Instrumentation and Control, Electrics and Mechanics.